Roofing Labor Cost Calculator

Enter the squares, the material, the pitch and storeys, the layers to tear off and the billed labor rate range, and the calculator returns the worker-hours for installation and tear-off, the days for a crew of four, the labor cost and the labor per square.

Labor is half or more of most roofing quotes, and it is the line that varies most between contractors; rebuilding it from hours makes a quote's labor checkable.

Roofing Labor Cost Calculator

Units
squares

With waste; from the shingle or roof area calculator

worker-hours

Leave the material's figure or use your crew's own

layers
worker-hours

About 0.4 for asphalt, 1 for tile

per worker-hour

What the contractor charges per hour of crew time, including wages, payroll costs, insurance and margin

per worker-hour

Example result for the starting values. Enter your own and press Calculate.

Roofing labor cost

$1,620 to $3,060

36 worker-hours for 24 squares of asphalt, architectural

Hours
36
Crew of 4
1.1 days
Per square
$68–$128
How the labor is built
Install24 sq × 1.1 h × 1 pitch × 1 storeys = 26.4 worker-hours
Tear-off24 sq × 1 × 0.4 h × 1 = 9.6 worker-hours
Total crew time36 worker-hours, about 1.1 days for a crew of 4
Labor cost36 h × $45 to $85 = $1,620 to $3,060
Labor per square$68 to $128
Show the arithmetic
  1. 24 sq × 1.1 h × 1 pitch × 1 storeys = 26.4 worker-hours
  2. 24 sq × 1 × 0.4 h × 1 = 9.6 worker-hours
  3. 36 h × $45 to $85 = $1,620 to $3,060
  • The billed rate is what a contractor charges per crew hour, not what a roofer is paid: the Bureau of Labor Statistics reports median roofer wages in the mid-$20s per hour, and payroll taxes, workers' compensation (high for roofing), insurance, equipment, overhead and margin roughly double to triple that.
  • Hours per square are estimating figures for a practised crew on a plain roof; cut-up roofs, many penetrations and bad weather add time. The roofing time calculator turns the same hours into days.

Understanding your result

The headline is the labor cost range with the worker-hours. The stats give the hours, the days for a crew of four and the labor per square. The breakdown separates install hours, tear-off hours, the total and the cost.

The figure to compare with a quote’s labor line is the labor per square. If a quote is far above it on a simple roof, ask what is included. The roofing time calculator turns the same hours into a schedule, the replacement cost calculator puts them in the whole price, and the estimate builder uses them for a roofer’s own quote.

How we calculate this

install hours = squares × hours per square × pitch factor × storey factor tear-off hours = squares × layers × tear-off hours per square × pitch factor × storey factor labor cost = (install + tear-off) × billed rate (low and high) crew days = hours ÷ (4 workers × 8 hours)

The hours per square are estimating figures, not measurements of your crew; they are the right order of magnitude and they scale correctly with material, pitch and height. A roofer with job records should enter their own. The estimate guide explains how labor lines are written.

The assumptions behind the numbers

Assumption Default Where it comes from
Install hours per square three-tab 1.0, architectural 1.1, designer 1.4, exposed metal 2.0, standing seam 3.0, cedar 2.5, synthetic 2.0, concrete tile 3.5, clay tile 4.0, slate 6.0, membrane 1.5 Roofing estimating practice for a walkable roof
Tear-off 0.4 h per square per layer (asphalt) Estimating practice; about 1 h for tile
Pitch 1.0 / 1.3 / 1.6 Estimating practice
Storeys 1.1 / 1.2 Estimating practice
Billed rate $45 to $85 per worker-hour A broad range for US contractors; enter your local rate
Roofer wages mid-$20s per hour median US Bureau of Labor Statistics, Occupational Employment and Wage Statistics (roofers)

Assumptions last reviewed October 7, 2026.

The calculator does not include supervision, travel, cleanup days or weather delays. The pricing guide sets labor against materials.

Two worked examples

An architectural shingle reroof

24 squares, walkable, one storey, one layer off, $45 to $85 an hour.

  • Install: 24 × 1.1 = 26.4 h; tear-off: 24 × 0.4 = 9.6 h
  • Total: 36 h, about 1.1 days for four
  • Labor: $1,620 to $3,060, $68 to $128 per square

Concrete tile on a steep two-storey house

32 squares, steep, two storeys, one layer of tile off at 1 hour per square, $55 to $95 an hour.

  • Install: 32 × 3.5 × 1.3 × 1.1 = 160.2 h; tear-off: 32 × 1 × 1.43 = 45.8 h
  • Total: 205.9 h, about 6.4 days for four
  • Labor: $11,326 to $19,562

Where to find your inputs

Squares. With waste, from the shingle or roof area calculator.

Billed rate. From a contractor’s time-and-materials rate or your own books.

Layers. From the edge of the roof.

Common mistakes

  • Using the wage as the rate. The billed rate includes overhead.
  • One rate for every pitch. Steep is slower.
  • Forgetting tear-off. It is a quarter of the hours on a reroof.
  • Ignoring height. A second storey adds hoisting.
  • Heavy materials at shingle hours. Tile and slate take three to six times longer.
  • No weather allowance. The time calculator adds it.

Questions people ask

How much is roofing labor per square?
On a walkable architectural shingle reroof with one layer off, about 1.5 worker-hours per square including tear-off, so $68 to $128 per square at billed rates of $45 to $85 an hour. Steep roofs, two storeys and heavy materials raise it several-fold.
How many hours does it take to roof a square?
Estimating figures for a practised crew on a walkable roof: about 1 worker-hour for three-tab, 1.1 for architectural, 2 for exposed-fastener metal, 3 for standing seam, 3.5 for concrete tile and 6 for slate, plus about 0.4 hours per square per layer of asphalt tear-off.
What do roofers earn versus what labor costs?
The Bureau of Labor Statistics reports median roofer wages in the mid-$20s per hour. A contractor's billed rate is two to three times that, because it carries payroll taxes, workers' compensation (among the highest of any trade), liability insurance, equipment, overhead and margin.
How long does a crew take to reroof a house?
A crew of four on a 24-square walkable shingle roof with one layer off works about 36 worker-hours, about a day. The roofing time calculator adds weather and schedules it.
Why does pitch change labor so much?
Above about 6/12 the crew cannot walk the roof; they set roof jacks and planks, wear harnesses and move slower. Estimators add about 30 percent to labor from 7/12 to 9/12 and 60 percent above.
Is tear-off labor separate?
In this calculator, yes, so it can be compared with a quote's tear-off line. Tile and slate take longer to remove than asphalt; enter about 1 hour per square.
Embed this calculator on your site

Paste the code into any page. It is free to use; the only thing we ask is that the credit link under the calculator stays.

See all calculators: embed