Roofing Time Calculator

Enter the squares, the material, the pitch and storeys, the layers to tear off, the crew size, the length of the working day, a weather allowance and the setup time, and the calculator returns the worker-hours, the crew days and the days on site with weather.

A roofing job is measured in worker-hours and lived in days; the calculator keeps the two apart so a crew size or a wet week can be changed without redoing the estimate.

Roofing Time Calculator

Units
squares

With waste

layers
workers
hours
%

Extra days for rain, wind and heat; 20 to 30% in spring and autumn

hours

Per job: deliveries, tarps, magnet sweeps, final cleanup

Example result for the starting values. Enter your own and press Calculate.

Time on site

2 days

52 worker-hours for a crew of 4, with 20% for weather

Worker-hours
52
Crew days
1.6
With weather
2
How the time is worked out
Install24 sq × 1.1 h × 1 × 1 = 26.4 worker-hours
Tear-off24 sq × 1 × 0.4 h × 1 = 9.6 worker-hours
Setup and cleanup4 h × 4 = 16 worker-hours
Total52 worker-hours
Working days52 ÷ (4 × 8 h) = 1.63
With 20% weather allowance1.95 → 2 days
Show the arithmetic
  1. 24 sq × 1.1 h × 1 × 1 = 26.4 worker-hours
  2. 24 sq × 1 × 0.4 h × 1 = 9.6 worker-hours
  3. 4 h × 4 = 16 worker-hours
  4. 52 worker-hours
  5. 52 ÷ (4 × 8 h) = 1.63
  6. 1.95 → 2 days
  • The hours per square are estimating figures for a practised crew; a homeowner takes three to four times as long. The DIY calculator uses that factor.
  • A tear-off day should end dried-in: never strip more than the crew can cover with underlayment before dark or the next rain.
  • Walkable roofs go fastest; most single-storey asphalt reroofs are one or two days.

Understanding your result

The headline is the days on site, with the worker-hours, the crew and the weather allowance. The stats give the worker-hours, the crew days and the days with weather; the breakdown builds each line.

The hours are the same as the labor cost calculator uses, so the two agree; the days feed the project schedule, which puts dates on them. Homeowners should multiply the hours as the DIY calculator does.

How we calculate this

install = squares × hours per square × pitch factor × storey factor tear-off = squares × layers × tear-off hours × pitch factor × storey factor setup = setup hours × crew crew days = (install + tear-off + setup) ÷ (crew × hours per day) days = crew days × (1 + weather%), rounded up to the half day

Tear-off is 0.4 hours per square per layer for asphalt and 1 hour for tile and slate. The safety guide explains why steep roofs take longer.

The assumptions behind the numbers

Assumption Default Where it comes from
Hours per square by material, as in the labor calculator Roofing estimating practice
Tear-off 0.4 h (asphalt), 1 h (tile, slate) per square per layer Estimating practice
Crew 4 A typical residential crew
Day 8 hours Standard
Weather 20% A judgement for spring and autumn
Setup 4 hours per worker per job Estimating practice

Assumptions last reviewed October 7, 2026.

The calculator does not include waiting for materials or inspections. The pricing guide sets the hours against the price.

Two worked examples

An architectural reroof

24 squares, walkable, one storey, one layer, crew of 4.

  • Install 26.4 h; tear-off 9.6 h; setup 16 h; total 52 h
  • Crew days: 1.63; with 20%: 2 days

Slate on a steep two-storey house

24 squares, steep, two storeys, crew of 5.

  • Install 205.9 h; tear-off 34.3 h; setup 20 h; total 260 h
  • Crew days: 6.51; with 20%: 8 days

Where to find your inputs

Squares. From the shingle or roof area calculator.

Crew and day. From the contractor.

Weather. From the season.

Common mistakes

  • No weather allowance. Rain stops tear-off.
  • Days without setup. Deliveries and cleanup take time.
  • Shingle hours for tile. Heavy materials take longer.
  • Ignoring pitch. Steep is slower.
  • Huge crews on small roofs. Diminishing returns.
  • DIY at pro speed. Multiply by 3 to 4.

Questions people ask

How long does it take to replace a roof?
A crew of four reroofs a typical 24-square walkable asphalt roof with one layer off in about two days with a 20 percent weather allowance: about 36 worker-hours of tear-off and installation plus setup and cleanup. Steep, high or heavy roofs take several times longer.
How many squares can a crew do in a day?
On a walkable shingle roof a crew of four installs about 20 to 25 squares a day without tear-off and 15 to 20 with it. Standing seam, tile and slate are two to six times slower.
How much time should I allow for weather?
20 to 30 percent in spring and autumn, less in a dry summer. Roofs are not torn off when rain is forecast, and high wind and heat stop work too.
Does a bigger crew finish faster?
Up to a point: more workers shorten the days, but setup, deliveries and inspection do not shrink, and on a small roof a large crew gets in its own way. The calculator scales setup with crew size.
How long does a tile or slate roof take?
A 24-square slate roof on a steep two-storey house is about 260 worker-hours: eight days for a crew of five with a weather allowance.
Is the time the same for DIY?
No. Homeowners take three to four times a professional crew's hours; the DIY calculator applies that.
Embed this calculator on your site

Paste the code into any page. It is free to use; the only thing we ask is that the credit link under the calculator stays.

See all calculators: embed